Structural works & buildings

Foundations, reinforced-concrete frames and masonry for offices, housing and public buildings, from low-rise to towers.

One floor every eight days, concrete frames checked at every pour and one person in charge from excavation to roof.

Offices, housing, clinics, schools: we build the structure of buildings from one to twenty-one levels with our own cranes, tunnel formwork and mobile batching plant. The methods office prepares phasing, formwork cycles and shop drawings before the first shovel, so the site keeps its pace without improvising.

Structural works & buildings

What we do

  • Earthworks & foundations

    Excavation, shoring, bored piles and rafts, with geotechnical monitoring.

  • Reinforced-concrete frames

    Columns, walls and slabs, tunnel or traditional formwork, an 8-day cycle per level.

  • Masonry & partitions

    Bricks, blocks and partitions, renders and screeds ready for the finishing trades.

  • Waterproofing & roofs

    Flat roofs, parapets and upstands, water tests before handover.

  • 8 jper typical floor
  • R+20tallest frame delivered
  • 62buildings since 2015

Our method

Measurable performance, from earthworks to handover.

  1. 01

    Study

    2 – 6 wks

    Tender review, technical alternatives, quantities and a detailed priced offer.

  2. 02

    Preparation

    3 – 8 wks

    Schedule, shop drawings, site set-up, safety plan and procurement.

  3. 03

    Execution

    per contract

    Site management, self-checks, weekly meetings and reporting to the client.

  4. 04

    Handover

    2 – 4 wks

    Pre-handover checks, snag clearing, as-built file and defects warranty.

Our expertise

Related projects

Frequently asked questions

Answers to the questions we are asked most.

  • Both. Structural works can be a technical lot under a project manager, or the first lot of an all-trades contract that we run.

  • Rotating tunnel formwork, concrete produced on site, prefabricated rebar and crews dedicated to each task. The schedule is checked every week at the site meeting.

  • Test cubes at every pour, slump tests, rebar inspection before concreting and self-check sheets sent to the inspection body.

Build with certainty.

Tell us about your project: an answer and a first estimate within 72 hours.