The project
The frame of a 21-level office tower at the heart of the financial district, handed over two weeks before the contract date.
The challenge
A tight plot between two occupied buildings, groundwater eight metres down and a 34-month schedule set by the first tenants' arrival. No room to store rebar or for a second crane.
Our answer
Diaphragm wall and dewatering for the three basements, prefabricated rebar delivered just in time at night, a single tower crane with a 60 m jib and climbing formwork for the core. The cycle came down to eight days per floor from level 5.
The site in pictures


The results
- 34 moisfrom earthworks to roof
- −2 sem.on the contract date
- 0lost-time accidents