The project
A 9,800 m² school campus designed and built in fourteen months, ready for the start of the school year.
The challenge
A school year start that could not move, a budget fixed before the sketch and a brief that changed during design (a gym was added).
Our answer
Design & build with a partner architect, a repetitive column-and-slab structure, prefabricated stairs and parapets, and works launched building by building as each detailed design was approved.
The site in pictures


The results
- 14 moisfrom sketch to keys
- 1 200pupils welcomed
- 0price amendments